Yen Phu – Tran Hung Dao 110kV underground cable line
The route is 4km long from the Tran Hung Dao 110kV station toYen Phu 110kV station.
The project is invested by Hanoi Power Corporation (EVNHANOI).
Power Consulting Joint Stock Company 1 is the contractor performing the following: Consulting, Surveying, preparing the construction drawing design for the project.