Yen Phu 110kV substation (Ha Noi) :
Project scale: 3x63MVA
Project location: Ha Noi City
Investor: Hanoi Power Corporation (EVNHANOI)
Scope of work: Survey, Prepare investment project, Prepare technical design, Prepare construction drawing design.