Thanh Xuan 110kV underground cable line:
The route is 400m long from the Thanh Xuan 110kV station to the Chem – Thanh Cong connection 110kV station.
The project is invested by Hanoi Power Corporation (EVNHANOI).
Power Consulting Joint Stock Company 1 is the contractor performing the following: Consulting, Surveying, preparing the construction drawing design for the project.