Na Rua – Cao Bang power supply equipment supply and installation
In October 2012, Cao Bang Integrated Steel Complex was constructed on an area of 79.54ha in Chu Trinh commune, Cao Bang city. This is the largest investment project in the locality then with a total investment of 1,911 billion VND, a total design capacity of 220,000 tons of steel billets/ year.
During the construction period, the company actively implemented the Recruiting Na Rua iron mine project, invested in the construction of the mine infrastructure, such as: sorting factory, environment prevention dam, water supply system, power supply system and auxiliary items in service of iron ore clearance in the southern area of Na Rua iron mine to promptly supply raw materials for the factory.
The project of exploiting Na Rua iron mine in Tan Giang ward with reserves of more than 16,700 tons of iron ore, the output reaches 350,000 tons of refined iron ore/ year, meeting the demand for high-quality and stable materials for complex production in over 40 years.
PCSC1 is the implementing unit of design – supply – installation (EPC) equipment for the substation 35/0.4kV-400kVA and 35kV line connecting the power supply to Na Rua mine.