Ha Dong – Son Tay 110kV transmission line (Ha Noi)
The line is 38km long. The project is invested by the Hanoi Power Corporation (EVNHANOI), renovating 110kV line from Ha Dong 220kV substation to Son Tay 110kV substation.
PCSC1 is the implementing contractor: Consult, survey, prepare feasibility study, prepare construction investment plan, prepare bidding documents Total contract value: VND 6,202,182,646.